As ever, I’m not posting because I’ve nothing to say :)

We’re still waiting for Centrelink to be happy with the Assurance of Support information. There’s some paperwork our Assurer needs to provide them with which requires processing by the Inland Revenue, so until that comes back, there’s nothing happening. On a cheerier note, though, DIMA have everything they need and have had for several weeks. That will now all have been processed and if there were any issues we’d know about them by now.

So – back to waiting.

Leave a Reply

You must be logged in to post a comment. Login »

All content (C) 1996-2008 John Dow